Operations
24/7 shift coverage across multiple sites, with a single escalation path.
AGATE GREEN is a Malaysian infrastructure company that builds and operates GPU compute across Southeast Asia, with a site network that is still expanding. We design the hall, own the silicon and run the service — we are not reselling someone else's region.
We start from the power and the site, then add silicon. The order matters: a GPU fleet is straightforward to buy and difficult to feed. Every AGATE GREEN site is built as modular integrated halls so capacity can be added in blocks that match a tenant's ramp rather than a landlord's financing cycle.
The same discipline applies to platform choice. Tiers exist because workload classes exist: one that fits comfortably on a single 96 GB card, and one that has to be spread across many devices. Selling the larger tier to the smaller job is easy and we do not do it.
We also publish the boundary of our numbers. When a design is compared and found to reduce energy use by up to 40%, that is a design comparison and we say so. When PUE is reported, facility PUE and IT PUE are separate figures with the measurement boundary stated.
Multiple sites across Southeast Asia — the region where our customers actually run workloads. Cyberjaya is the primary campus inside the Multimedia Super Corridor; further Malaysian campuses take the estate to industrial scale, and sites beyond Malaysia provide the geographic diversity that a single-site operator cannot offer. The network is still expanding.
One engineering team operates every site, which is why a deployment at one site is not a different support relationship from one at another. Escalation, spares and reporting are the same in every country.
Data stays in the country of the site you contract. Cross-border replication happens only on a written instruction, never as a default.
The team
Small enough that the people who design a deployment are the people who answer for it in production.
24/7 shift coverage across multiple sites, with a single escalation path.
GPU integration, fabric, scheduler and the benchmark lab.
Interconnection, renewable position and modular hall delivery.
Site selection, permits, construction programme and commissioning.
Reservations, term structuring and customer reporting.
Capacity enquiries go to the team that runs the estate. You will get a configuration and a measurement, not a marketplace listing.