Multiple operating, reserved and planned sites across Southeast Asia, run by one operating team — plus on-request capacity further afield. The site network is expanding. The table filters with the rail; select a row for the site detail.
SitePowerIT loadCoolingStatus
Cyberjaya Grid Multi-MW Air Reserved
Klang Grid + Gas 20–40 MW Liquid (direct-to-chip · direct-to-rack) In planning
Melaka Grid + Gas 80–100 MW Liquid (direct-to-chip · direct-to-rack) In planning
Sarawak — 10 MW — In planning
Bangkok Grid Per request Air On request
Central Java Grid 1.3 MW Air Reserved
West Java Grid 10 MW Liquid (direct-to-chip) Reserved
Singapore Grid power On request Per agreement On request
Australia Grid power On request Per agreement On request
Japan Grid power On request Per agreement On request

IT load figures are as planned; planning and on-request rows are indicative.