Overview
The primary AGATE GREEN campus sits inside the Multimedia Super Corridor — the zoning and connectivity envelope most Malaysian enterprise IT already operates within. Phase 1 delivers multi-megawatt IT load at Tier III design intent, built as modular integrated halls on raised service decking.
The site carries the Tier 01 fleet: NVIDIA RTX PRO 6000 Blackwell in eight-GPU nodes, 96 GB per card. The token factory, the agent cloud and the render farm all run from that cluster; separating those tenants is a scheduler policy rather than a second hall, which is what keeps a mixed workload estate economic at this scale.
Power & site
Power is grid-connected with a renewable PPA position covering the contracted load. Interconnection was secured before the first module was ordered — the ordering we now apply at every site, because a hall without a feed is a shed.
Cooling is module-integrated air, sized to the IT load rather than to a catalogue. Facility PUE and IT PUE are reported separately, with the measurement boundary stated.
What runs here
- Inference and token serving
- AI agent workloads
- Render and visual computing
- Benchmark lab for prospective customers