Overview
West Java is the diversity site. Its purpose is not incremental capacity but a second Indonesian location for customers who cannot accept a single-site dependency — whether for regulatory, contractual or plain operational reasons. It carries 10 MW.
The design carries direct-to-chip liquid cooling at site level, sized to the high-density GPU fleet, under the same operating model as the rest of the estate. Two Indonesian sites with one operating team means failover is a scheduling decision rather than a new vendor relationship.
Power & site
Grid-connected at 10 MW, with interconnection secured before fabrication. Blocks are ordered against signed demand rather than a construction calendar, which is how we avoid building halls that sit empty.
Timing is published in the compute capacity inventory and updated when a block is committed. We do not quote a completion date we have not funded.
What runs here
- Disaster recovery for Central Java
- Overflow render capacity
- Regional training workloads